Choose crane
Identification
Date of Lift
Approvals (Signature Required)
Approvals from the Following Approvals from the Following Suggested: Rigging Supervisor, Operator, Client, Site Manager, Engineer, Safety & Health, Construction Manager
| Title | Name | Signature | Date |
|---|---|---|---|
Notes
Ground Bearing Pressure
Maximum Possible GBP
RIGGING
Total Rigging Weight
PRE-LIFT CHECKLIST
| PRE-LIFT CHECKLIST | YES | NO |
|---|---|---|
| Has an inventory of equipment been done? | ||
| Have weather conditions been considered? | ||
| Have the electrical safety procedures been reviewed? | ||
| Have good rigging practices been implemented? | ||
| Have the safety precautions for lifting tight quarters and confined spaces been reviewed? | ||
| Has a method of attachment and handling been determined? | ||
| Are all lifting lugs engineered to specifications? | ||
| Has the matting been inspected and approved? | ||
| Has the stability of the ground been assured? | ||
| Have disconnecting/connecting means been developed? | ||
| Has the orientation of equipment been confirmed? | ||
| Is survey equipment required? | ||
| Is a Pre-Lift Meeting planned? | ||
| Is the total weight below 75 % of capacity? | ||
| Are all the required approvals signed? | ||
| Has the crane and lifting equipment been inspected? |
LOAD AND CAPACITY CALCULATIONS
A. Weight of Equipment – Live Load
3. Total Weight of attachments (a,b,c,d,& e)
4. Total Weight of Equipment
B. Crane Setup
1. Type of Crane Configuration
2. Rated Capacity
Lifting Arrangement
e. Rated Capacity under Most Severe Conditions
C. Block & Cable
Cable weight is 0. In field 5 select Enter manually…, or type the engineer's value manually.
b. Size of Cable
D. Jib & Auxiliary Boom Head
a. Is the Jib to used?
7. Jib Stored — Weight (if applicable)
Totals
TOTAL WEIGHT
Percent of cranes Capacity
Print documents
No pages yet. Add a document — every page of a PDF becomes a separate page you can rename, rotate, mark up or delete.